This design-build project serves city vehicles and includes a new parking garage extending from the existing parking structure over the City of Scottsdale’s fleet parking area. The design takes into account the needs of CNG vehicles, including pre-wiring for multiple dual-port electrical vehicle charging stations. In addition, a new photovoltaic solar system was installed across several portions of the structure